ANALISIS KETERLAMBATAN PEMBANGUNAN TOL DENGAN METODE STOKASTIK DAN MITIGASI RISIKO

  • Muhammad Iqbal Universitas Riau

Abstract

Based on information accuired from contractor and project owner, this Toll Road Contruction has experienced significant delay in its completion. The purpose of this case strudy is to identified, asses simulate and reduce delay risk in Toll Road Contruction using stochastic method and mitigation risk. In fact, there are some article about delay analysis related to toll road contruction, but in this case study with combining 2 analysis method  it is expected to provide more input for researchers. The results of mitigation in this project duration delay are relatively maximum and in accordance with the research objectives. From risk identification, there are 9 risk that affect the performance of time. Some of the highest risk that have biggest impact on performance of time such as land accuisition, inadequate investigation work before design and inacurrate survey during pre – design. Risk analysis based on stochastic analysis found that with 90% of confidence level, the possibility of this project can be completed in 782-821 days, in its realization this Toll Road Contruction faced delay up to 1112 day (probabability of occurrence was above 95%).

Keywords: Delay Analysis, Stochastic, Risk Mitigation, Toll Road

References

Ari Sandhyavitri, (2019). Stochastic analyses for managing risk of delay in Duri oil construction projects, Indonesia.

Artika, (2014). Penerapan Metode Lean Project Management dalam proyek konstruksi pada pembangunan gedung dprd kabupaten ogan ilir Metode Lean project management, 6.

Aziz R. F. (2013). Ranking of Delay Factors in Construction Project After Egyptian Revolution, dalam Jurnal Alexandria Engineering Journal, Alexandria University, Mesir.

Pitroda, P.A (2017). Rangking Of Factor Affering Formwork Causing Delay in Contruction Project by RII Method. India: Intitut Technology Babaria.

Hermawan, F. (2011). Pengaruh Pembebasan Lahan Terhadap Risiko Proyek Konstruksi. Vol. 32 no. 2 tahun 2011, ISSN 0852-1697

Hong anh vu, J. W. (2016). Research.on cost overrun risk of construction phase of vietnam highway international contracting project. Engineering, Vol 8. No. 3. institute, p. m.

Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge - Fifth Edition PMBOK, Project Management Institute, Inc, Pennsylvania.

Robbani, B. (2020). Analisis Faktor Keterlambatan dan Optimasi Kinerja Proyek

Pengadaan Transmisi 500 KV Sumatra. Pekanbaru: universitas riau.

Sakinah, B. F. (2015). Analisis penyebab keterlambatan pada pekerjaan konstruksi jalan kabupaten lombok tengah dengan metode analisa faktor. Malang. universitas brawijaya.

Sukirno. (2016). Analisis Risiko Waktu di Proyek Konstruksi Untuk meningkatkan kinerja waktu dan biaya (Studi kasus proyek ampuh pressure maintenance). Pekanbaru.

Published
2020-12-28
Section
Articles
PDF (Bahasa Indonesia)
Abstract views: 441
downloads: 411