PERBANDINGAN BIAYA DAN WAKTU SISTEM DILATASI BALOK KANTILEVER DAN DUA KOLOM PADA PROYEK GEDUNG BERTINGKAT KAMPUS B UNIVERSITAS AIRLANGGA

  • Monika Natalia Politeknik Negeri Padang
  • Riswandi Riswandi Politeknik Negeri Padang
  • Yan Partawijaya Politeknik Negeri Padang
  • Jajang Atmaja Politeknik Negeri Padang
  • M. Iqbal Kuswandi Politeknik Negeri Padang

Abstract

Almost all regions of Indonesia are geographically vulnerable to natural disasters, earthquake. One way to implement a very long and structurally stable building design in the event of an earthquake or other circumstances is to provide a dilation system for the building. This research was conducted in a multi-storey parking building project at Airlangga University Campus B which applies a cantilever beam dilatation system and will be compared with a two-column dilatation system in terms of cost and time. Cantilever beam dilatation is a structural separation that uses a beam structure with one end having a clamp and the other end is free, while two-column dilatation is a structural separation that uses two columns side by side with a certain distance. From the results of the study, it was found that the cost of structural work with cantilever beam dilatation was Rp. 76,755,100,000, - and for two-column dilatation is Rp. 76.063.550.000,- while the total project time with cantilever beam  dilatation is 451 working days, and for two-column dilatation is 447 working days. The application of two-column dilatation is 0.9% more cheaper and four days earlier than the application of the cantilever beam dilatation system.

Keywords: Cantilever beam, cost, dilation system, time, two columns

References

Lestari, R, T, P., Susilowati, T & Hermawati, 2020, "Hubungan Pengetahuan Siaga Gempa Bumi dan Sikap Siswa Terhadap Kesiapsiagaan Di SD Negeri 2 Cepokosawit", Gaster, vol. 18, no. 2, pp 172-185, doi: 10.30787/gaster.v18i2.523.

Handiman, 2012, "Kajian Pengaruh Dilatasi pada Bangunan Pabrik PT. Agri First Flour Medan"' Tugas Akhir, Universitas Sumatera Utara, Medan.

Nugroho, F, 2016, "Building Performance Evaluation of A.N.S Hotel Building Plan with and Without Dilatation in Earthquake Prone Areas", ICTIS, doi: 10.21063/ICTIS.2016.1061. 9 pages.

Rahmadani, M., Aprillin, R, & Murtinugraha, E, 2019, "Analisa perilaku bangunan tidak beraturan secara horizontal dengan dilatasi terhadap gempa", Jurnal Menara Teknik Sipil, vol 14, no. 2, pp 52-66.

Arsitur Studio, 2020, Pengertian Dilatasi, Fungsi dan Tujuan Dilatasi beserta Contoh Penerapannya, diakses 4 Februari 2022, https://www.arsitur.com/2018/09/pengertian-dilatasi-fungsi-dan-contoh.html

Sumarsono, R,A, dan Fajari, M,A, 2019, "Improving Seismic Behaviour Of Irregular Building Through Double Column and Console Beam Application", SCESCM, https://doi.org/10.1051/matecconf/201922585805022 8 pages.

Sunaryati, J, 2019, "Analisis Jarak Dilatasi Bangunan Ber-Lay-Out L dan Perhitungan Penulangan Elemen Balok dan Kolom di sekitar Dilatasi", Prosiding. 6th ACE Conference. 29 Oktober 2019, Padang, Sumatra Barat, pp 215-238.

Prihandoyo, R., Bayzoni., Husni, H.R. & Alami, F, 2021, "Evaluasi Pengaruh Dilatasi Pada Gedung Baja Empat Lantai Terhadap Beban Gempa Menggunakan Metode Statik Pushover", JRSDD, vol. 9(, no. 4, pp 749-762.

Rahim, S. dan Thomas, N.A, 2020, "Performance of Different Dilatation Methods To Reduce The Effect Of Seismic Loads", IRJET, vol 7, no. 6, pp 7052-7056.

Tyarpratama, M.A, 2017, "Analisis Statik Non-Linier Pushover pada Optimasi Desain Gedung Pendidikan Bersama FKUB dengan Variasi Konfigurasi Dinding Geser", Tugas Akhir. Universitas Brawijaya, Malang.

Mierza, M.K, 2017, “Analisis Sistem Dilatasi Dengan Balok Kantilever Disertai Perhitungan Struktur Atas Dan Struktur Bawah", Tesis, Universitas Sumatera Utara, Medan.

Prabowo, S,W, 2018, "Evaluasi Pengaruh Kolom Dilatasi terhadap Kinerja Struktur pada Gedung Berbentuk Linear menggunakan Metode SRPMM", Tugas Akhir, Universitas 17 Agustus 1945, Samarinda.

Trikanada, M, 2021, “Analisis Perbandingan Efektivitas Penggunaan Dilatasi Balok Kantilever dan Dilatasi 2 Kolom pada Proyek Gedung Parkir Bertingkat Kampus B Universitas Airlangga", Tugas Akhir, Universitas Jember.

Badan Standarisasi Nasional, 2019, “SNI 03-1726:2019 Tata Cara Perencanaan Ketahanan Gempa Untuk Struktur Bangunan Gedung Dan Non gedung Sebagai Revisi Dari Standar Nasional Indonesia 1726:2012”

Niri Rubber, 2022, Sistem Dilatasi Bangunan, diakses 4 Februari 2022, https://www.niri-rubber.com/sistem-dilatasi/.

Putra, P dan Febriansyah, 2021, "Perbandingan Biaya dan waktu Bekisting Aluma System dengan Bekisting Scaffolding pada Pekerjaan Balok dan Pelat Proyek Apartemen Arandra Residence Tower 3", Tugas Akhir, Prodi D4 Manajemen Rekayasa Konstruksi, Jurusan Teknik Sipil, Politeknik Negeri Padang.

Honesty, F. dan Ramadhani, S, 2021, "Optimalisasi Waktu dan Biaya Pelaksanaan Pekerjaan dengan Metode Least Cost Analysis pada Proyek saat Pandemi Covid-19". Tugas Akhir, Politeknik Negeri Padang.

Published
2022-12-31
Section
Articles
PDF (Bahasa Indonesia)
Abstract views: 228
downloads: 164