RESPON RISIKO DAN MITIGASI RISIKO PADA FAKTOR-FAKTOR PENYEBAB WASTE KONSTRUKSI DENGAN MENGGUNAKAN PENDEKATAN LEAN CONSTRUCTION (STUDI KASUS: PROYEK X KAPUAS)

  • Oryza Lhara Sari Institut Teknologi Kalimantan
  • Doni Rahman Maulana Institut Teknologi Kalimantan

Abstract

Waste is a problem that often occurs in construction projects. Waste is in the form of activities that utilize resources but do not produce the expected added value (value). Therefore, it is necessary to identify waste, in this research we identify the factors that cause construction waste in the rehabilitation project and improvement of irrigation networks in the working area of Block A, Kapuas Regency. Obtained 9 variables with 43 indicators of factors that cause waste which are the basis for this research. The method used is the severity index method to obtain the dominant and main factors causing waste. The results of this study are the dominant and main factors for the occurrence of waste, namely with codes A1, A6, B2, B3, B6, D4, E4, E6, F6, I12 with a moderate risk category, based on the severity index value, the dominant causative factor risk response is transfer.

References

Abduh, M., Konstruksi Ramping: Memaksimalkan Value dan Meminimalkan Waste. Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung, 2007.

Al-Moghany, S.S., Managing and Minimizing Construction Waste in Gaza Strip. Islamic University of Gaza, Palestine, 2006.

Koskela, L dkk. The Foundation of Lean Construction. In: Best R., and Valence, G. D., eds. Design and Construction: Building in Value, Butterworth-Heinemann. 211- 255, 2002.

Tanjung, L. Syifa., Evaluasi Perencanaan Dan Pengendalian Proyek Dengan Menggunakan Metode Lean Project Management (Doctoral Dissertation, Universitas Islam Negeri Sultan Syarif Kasim Riau), 2017.

Tamallo, Marselino Gamaliel, & Afrizal Nursin., Evaluasi Non-Physical Waste Dengan Lean Construction Pada Proyek Gedung Sanggala. PROKONS: Jurusan Teknik Sipil, 14(2), 12-18, 2020.

Zulaida, Cintya Puput, & Bambang Endro Yuwono, Analisis Pengelolaan Limbah Konstruksi dengan Metode Lean Constuction. In Prosiding Seminar Intelektual Muda (Vol. 1, No. 2), 2019.

Gaspersz, V., Continous [sic] cost reduction through Lean-Sigma approach: strategi dramatik reduksi biaya dan pemborosan menggunakan pendekatan Lean-Sigma. Gramedia Pustaka Utama, 2006.

Koentjoro, N., Metode-Metode Penelitian Masyarakat. Jakarta: PT. Gramedia Pustaka Utama, 2005.

Larson, E. W., Gray, C. F., & Desai, G. V. Project management: The managerial process, 2011.

Arifin, N., & Soepriyono, Analisa Risiko Kontrak Kerja Lumpsum Pada Proyek Gedung K3 Surabaya. axial: jurnal rekayasa dan manajemen konstruksi, 2019.

Triase, R. M. Analisis Manejemen Risiko Pembangunan Proyek Jalan Lintas Bawah Tanah Bunderan Mayjen Sungkono Surabaya. Magister Teknik Sipil, Universitas, 2019.

Published
2023-11-24
Section
Articles
PDF (Bahasa Indonesia)
Abstract views: 138
downloads: 121