ANALISIS PENENTUAN PRIORITAS PEMELIHARAAN BANGUNAN DENGAN METODE ”ANALYTICAL HIERARCHY PROCESS” PADA BANGUNAN GEDUNG CREATIVE SPACE UNICORN - SURABAYA

  • M. Roudlloh Nur Kusuma putra Universitas 17 Agustus 1945
  • Michella Beatrix Universitas 17 Agustus 1945 Surabaya

Abstract

according to the requirements and wishes of the user. This research uses the "Analytical Hierarchy Process (AHP)" method, as a decision maker in determining the order of maintenance priorities by analyzing component condition indices. From the results of the analysis, it was found that the level of damage was based on the Condition Index value for the Creative Space Unicorn Building. It shows that the priority for building maintenance is the first architectural component in wall paint with a percentage of 1.16, the second utility, namely lights, has a percentage value of 0.79... So It can be concluded that the Creative Space Unicorn Building has a building condition index on a scale of 72.04. means that the description of the condition of the building is sufficient (only minor damage occurred).

References

C, Putri, Vina, Prioritas Pemeliharaan Bangunan Gedung-Gedung Puskesmas Dengan Bahasa Pemrograman Berbasis Gis Dengan Metode Analitycal Hierarchy Process (Studi Kasus Gedung-gedung Puskesmas Kabupaten Sukoharjo), Skripsi, Fakultas Teknik Sipil: Universitas Sebelas Maret (2015).

Iskandar Muda P, Prioritas Pemeliharaan Bangunan Gedung Berbasis Analytical Hierarchy Process. Jurnal Teknik Sipil, UniversitasPendidikan Indonesia. . (2021).

Santosa, S., Tri Rochadi, M., Teknik Sipil Politeknik Negeri Semarang Jl Sudarto, J. H., & Tembalang Semarang, S. (N.D.). Penentuan Prioritas Perbaikan Gedung Menggunakan Metode Ahp Dari Sudut Pandang Tenant.

Peraturan Menteri Pekerjaan Umum No.24/PRT/M/2008 tentang Pedoman Pemeliharaan dan Perawatan Gedung, Departemen Pekerjaan Umum, Jakarta (2008)

Published
2024-06-25
Section
Articles
PDF (Bahasa Indonesia)
Abstract views: 70
downloads: 49