STUDI PERENCANAAN KRIB SEBAGAI PENGAMAN TEBING SUNGAI KRUENG ACEH DI DESA CAPEUNG ACEH BESAR
DOI:
https://doi.org/10.36341/racic.v9i2.4405Keywords:
krib, river bank, floodAbstract
Sand dredging activities in the Krueng Aceh river, which is the main and largest river in the Aceh Besar Regency and Banda Aceh City, causes degradation of the bottom of the Krueng Aceh River which can trigger the collapse of river banks.Therefore, a study was carried out on planning the construction of krib as an alternative building that could protect the banks of the Krueng River in Aceh from water scouring which occurs especially during floods. The location of this planning study is located in Capeung Village, Seulimuem District, Aceh Besar Regency. The data used in this planning study includes rainfall data, topographic maps, soil mechanics data and maps of the Krueng Aceh watershed. Calculations carried out in this planning study include calculating rainfall and planned flood discharge, krib construction planning and krib stability analysis. The planned krib construction has a length of 5 meters and the distance between the krib is 10 meters. The height of the krib at the base is 0.75 meters and at the ends 0.5 meters. The construction of the krib is planned to be inclined towards the upstream by 10o, the slope of the krib protection layer is 1:2.5 and the slope of the lighthouse krib is 1:20. The soil at the location where the krib is planned is capable of withstanding the weight of the entire krib construction and the krib construction is safe against shear forces and overturning moments.
Downloads
References
I. Misra, S. Hakim, and A. Pramana, Manajemen Risiko: Pendekatan Bisnis Ekonomi Syariah, no. July. 2020.
N. O. M. Alotaibi, “Managing critical factors causing delays in public construction projects in the Kingdom of Saudi Arabia.†Curtin University, 2018.
A. N. Patel and J. Pitroda, “Rankings of Factor Affecting Formwork Causing Delay in Construction Project By RII Method,†J. Constr. Build. Mater. Eng., vol. 3, no. 1, 2017.
M. Gündüz, Y. Nielsen, and M. Özdemir, “Quantification of delay factors using the relative importance index method for construction projects in Turkey,†J. Manag. Eng., vol. 29, no. 2, pp. 133–139, 2013.
N. Vasishta, D. S. Chandra, and S. S. Asadi, “Analysis of risk assessment in construction of highway projects using relative importance index method,†Int. J. Mech. Eng. Technol., vol. 9, no. 3, pp. 1–6, 2018.
N. Rahmawati, dan Tenrisukki, “Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi-Cawang-Kampung Melayu),†Rekayasa Sipil, vol. 14, no. 1, pp. 18–25, 2020, doi: 10.21776/ub.rekayasasipil.2020.014.01.3.
dan T. Ronal, “HASIL ANALISIS KORELASI DAN INTERKORELASI RISIKO KETERLAMBATAN PROSES PELAKSANAAN KONSTRUKSI JALAN TOL Manlian Ronald A. Simanjuntak 1) , Anang Noer Tachlish 2),†no. 369, pp. 404–412, 2020.
U. T. Uripto and I. Sadalia, “RISK MITIGATION IN THE LAUSIMEME DAM CONSTRUCTION PROJECT,†pp. 383–395, 2023.
A. Sandhyavitri, A. dan Aditya, and M. Yusa, “Mitigating Overloading Vehicle Effects in Relation to the Liddle Power Equations for Designing Road Pavement Lifespan,†vol. 186, no. APTE 2018, pp. 36–42, 2019, doi: 10.2991/apte-18.2019.8.
A. Sandhyavitri, I. Talha, M. Fauzi, and S. Sutikno, “Managing construction risks of the toll road project in Indonesia,†Int. J. Adv. Sci. Eng. Inf. Technol., vol. 7, no. 5, pp. 1934–1942, 2017, doi: 10.18517/ijaseit.7.5.1349.
M. S. Rahman and T. M. Adnan, “Risk management and risk management performance measurement in the construction projects of Finland,†J. Proj. Manag., vol. 5, pp. 167–178, 2020, doi: 10.5267/j.jpm.2020.5.001.
P. Rehacek and B. Bazsova, “Risk Management Methods in Projects,†J. East. Eur. Res. Bus. Econ., vol. 2018, pp. 1–11, 2018, doi: 10.5171/2018.790198.
A.C.C. Ezeabasili, N. U. Dim, C.A.C Ezeabasili, and J. J. Obiefuna, “The Identification of Risks and its Criticality in the Nigeria Construction Industry,†Int. J. Eng. Manag. Res., vol. 11, no. 1, pp. 58–62, 2021, doi: 10.31033/ijemr.11.1.9.
Downloads
Published
Issue
Section
License
1. Copyright of all journal manuscripts is held by the RACIC : Rab Construction Research
2. Formal legal provisions to access digital articles of electronic journal are subject to the provision of the Creative Commons Attribution-ShareAlike license (CC BY-NC-SA), which means that RACIC : Rab Construction Research is rightful to keep, transfer media/format, manage in the form of databases, maintain, and publish articles.
3. Published manuscripts both printed and electronic are open access for educational, research, and library purposes. Additionally, the editorial board is not responsible for any violations of copyright law.
licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.