IDENTIFIKASI FAKTOR YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK PENGADAAN TRANSMISI 500KV SUMATERA

  • Burhanuddin Robbani Construction Management; Magister Universitas Riau

Abstract

The construction of the 500 kV Sumatra transmission network is the main project supporting the transmission line below and first on the island of Sumatra. With the Engineering, Procurement, and Construction (EPC) project scheme in its implementation the main contractor experienced several technical and non-technical constraints that affected the time performance of the project itself. This study aims to identify the factors that influence the performance of the project implementation time from the pre-construction stage (licensing, land clearing, and design planning) to the construction of the construction. The research method used is a survey method of the Project Implementation Unit with analysis using the Relative Importance Index (RII) method. The results showed that factors related to licensing problems from the government, inaccurate survey data (Pre-Design), and scarcity of raw materials are the three main problems that affect the performance time of the Sumatra 500 kV transmission development project

References

Suryo Wijiono, Yusuf L., Setyo S., 2014, Identifikasi Faktor yang Berpengaruh terhadap Kinerja Waktu Pelaksanaan Proyek dengan Dana Pinjaman Luar Negeri pada Tahap Pra-Konstruksi (Studi Kasus: IDB Loan No.IND-01XX), dalam Jurnal Teknik Sipil, Universitas Indonesia, Depok.

Veithzal, Rivai., 2005, Manajemen Sumber Daya Manusia, Raja Grafindo Utama, Jakarta.

Aziz Remon Fayek, 2013, Rangking of Delay Factors in Construction Project After Egyptian Revolution, dalam Jurnal Alexendria Engineering Journal, Alexandria University, Mesir.

Sugiyono, Dr. Prof., 2017, Statistika Untuk Penelitian, Alfabeta, Bandung.

Pall Goutom, Andrian J.B, M. Skitmore, J.Gray, 2015, Comprehensive Review Of Delay in Power Transmission Project, dalam Jurnal International QUT, Queensland, Australia.

Ari Sandhyafitri., 2009, Manajemen Risiko Di Proyek Konstruksi, dalam Jurnal Media Komunikasi Teknik Sipil, Th.XVII/Februari/2009, Fakultas Teknik Universitas Riau, Pekanbaru.

Published
2019-12-30
Section
Articles
PDF (Bahasa Indonesia)
Abstract views: 236
downloads: 318