Skip to main content
Skip to main navigation menu
Skip to site footer
Home
Current
Archives
About
About the Journal
Submissions
Contact
Search
Search
Register
Login
Home
/
Archives
/
Vol 4 No 2 (2019): Desember
Published:
2019-12-30
Articles
IDENTIFIKASI FAKTOR YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK PENGADAAN TRANSMISI 500KV SUMATERA
Burhanuddin Robbani,
Construction Management; Magister Universitas Riau, Indonesia
54-65
PDF (Bahasa Indonesia)
This article have been read
236
times,
downloaded
318
times
PENGARUH LIMBAH PLASTIK BOTOL (LELEH) SEBAGAI MATERIAL TAMBAH TERHADAP KUAT LENTUR BETON
Indonesia
DONI RINALDI BASRI,
univrab, Indonesia
66-77
PDF (Bahasa Indonesia)
This article have been read
1285
times,
downloaded
985
times
PERILAKU STRES JALUR UJI TRIAKSIAL PADA TANAH LEMPUNG KARAWANG
puspa ningrum,
universitas abdurrab, Indonesia
78-90
PDF (Bahasa Indonesia)
This article have been read
261
times,
downloaded
229
times
A Decision Making PEMILIHAN LOKASI PENANGANAN PANTAI PROVINSI RIAU BERDASARKAN ANALYTICAL HIERARCHY PROCESS (AHP)
ANALYTICAL HIERARCHY PROCESS (AHP)
Rizki Ramadhan Husaini,
Universitas Abdurrab, Indonesia
91-106
PDF (Bahasa Indonesia)
This article have been read
272
times,
downloaded
451
times
PERILAKU STRUKTUR LANTAI PSSDB (PROFILED STEEL SHEET DRY BOARD) DENGAN LUBANG BULAT DITENGAH
Muhammad Yazid,
universitas abdurrab, Indonesia
107-118
PDF (Bahasa Indonesia)
This article have been read
297
times,
downloaded
145
times
MAKE A SUBMISSION
MAIN
MENU
HOME
Archieve
Editorial Team
Focus and Scope
Reviewer
Peer Review Policy
Publishing Process
Publication Ethics
Fees
Open Access Statement
Copyright And Licences
SERIAL NUMBER
E-ISSN : 2620-3170
P-ISSN : 2527-7073
DOWNLOAD AREA
Template Jurnal
Copy Right
Support By
Visitor Counters
Histats Counter
Flag Counter
Statcounter
Current Issue